Introduction: How Timber Flooring Installation Works
New flooring can transform your home — but how does the process actually work?
At FloorCraft, we take care of everything from the first measurement to the final finish. This guide breaks down every step so you know exactly what to expect when installing timber, hybrid, or laminate flooring in Adelaide.
Why Professional Installation Matters
Installing flooring isn’t just about laying boards. Correct subfloor preparation, moisture protection, and expert fitting mean the difference between a floor that lasts for decades and one that fails prematurely.
When you choose FloorCraft, you deal directly with Arben, our owner and flooring expert, ensuring consistent communication and top-quality workmanship.
Step 1: Free Measure and Quote
Onsite Assessment with Arben
- We visit your home or site to measure the space.
- Assess subfloor conditions — check for moisture, cracks, and levels.
- Discuss your needs, style, lifestyle, and budget.
Discussing Flooring Options
- Explore samples of engineered timber, hybrid, and laminate.
- Get advice on finishes, durability, and the best fit for each room.
- Receive a detailed, transparent quote with no hidden costs.
Step 2: Choosing Your Flooring Product
Confirming Timber Type, Colour, and Finish
- Lock in your choice of flooring — including species (if timber), colour, board size, and finish (e.g., matte, satin, gloss).
Selecting Accessories and Underlay
- Choose trims, scotia, stair nosings, and underlay types — moisture barriers or acoustic underlay if needed.
Step 3: Subfloor Inspection and Preparation
Checking for Moisture and Level Issues
- We check for dampness, uneven areas, and cracks.
- Moisture testing is essential — especially for concrete slabs.
Subfloor Prep — Levelling, Grinding, Barriers
- Grinding high points, filling dips with levelling compound.
- Applying moisture barriers where needed.
- Removing old adhesives or repairing damaged areas.
A well-prepared subfloor prevents future issues like squeaking, gapping, or cupping.
Step 4: Removal of Existing Flooring (If Required)
- Remove old carpet, tiles, vinyl, or timber.
- Waste is disposed of, and surfaces are cleaned ready for install.
- This is included in your quote if needed.
Step 5: Delivery and Acclimatisation of Timber
- Timber flooring products require acclimatisation on-site — typically 5 to 14 days, depending on the season.
- This allows the timber to adjust to your home’s temperature and humidity, reducing future movement.
Step 6: Installation Day — What to Expect
How Long Does Installation Take?
- Small spaces: 1–2 days
- Standard homes (75–100m²): 2–3 days
- Larger or complex jobs: 4–5 days
Noise, Dust, and Site Access
- Expect noise from cutting and nailing.
- Minimal dust — thanks to modern, dust-controlled equipment.
- Furniture may need to be moved — we’ll discuss this during quoting.
Step 7: Sanding and Polishing (If Applicable)
- Applies to raw timber installations (e.g., solid timber or unfinished engineered).
- Process includes:
- Full sanding
- 2–3 coats of finish (water-based or oil-based polyurethane)
- Drying time between coats
Step 8: Clean-Up and Final Handover
- Waste is removed.
- Floors are cleaned.
- Arben conducts a final walkthrough with you to inspect the work.
- You receive care and maintenance advice tailored to your flooring type.
Step 9: Aftercare Support and Maintenance Advice
- Guidance on cleaning, avoiding damage, and long-term care.
- Support for repairs, maintenance, or refinishing in the future.
- Products for ongoing care available at FloorCraft Online.
Common Questions About the Installation Process
- Do I need to move furniture? Yes — but we can assist or arrange it.
- Can floors be installed over tiles? Often, yes — with correct prep.
- How soon can I walk on the floor? Immediately for floating floors; 24–48 hours after polishing for sanded floors.
Conclusion: A Stress-Free Flooring Experience
The key to a beautiful, long-lasting floor isn’t just the product — it’s the process. From the first measure to the final clean-up, FloorCraft manages every step professionally and transparently.
Book your free measure and quote today — and let’s create a floor you’ll love.
FAQs About Timber Flooring Installation
1. How long does timber flooring installation take?
Typically 2–3 days for standard homes, plus time for subfloor prep or sanding if needed.
2. Do you handle subfloor preparation?
Yes — it’s part of our process and quoted upfront.
3. Is acclimatisation of timber necessary?
Yes — for timber products, it ensures stability after installation.
4. Can you install over existing tiles?
Yes — if the tiles are secure and level. Some levelling may still be required.
5. What happens if moisture is found?
We apply moisture barriers or advise solutions before proceeding — protecting your investment.